![api 560 standard api 560 standard](https://www.stdport.com/image/cache/API/15225-500x500.jpg)
This API standard offers mechanical description along with operation, maintenance, and test procedures of post-combustion NOx control equipment. Post Combustion NOx Control for Equipment in General Refinery Services This document indicates design areas that need attention for selection of burners and offers description of different burner types. Guidelines for the selection and/or evaluation of burners installed in fired heaters in general refinery services. The document indicates areas of design that need attention for HRSG system selection and offers information of various HRSG types.īurners for Fired Heaters in General Refinery Services
#Api 560 standard generator#
Guidelines for the selection and/or evaluation of Heat Recovery Steam Generator (HRSG) systems. Procedures are appropriate for designing tubes for corrosive and non-corrosive applications. 51 12.2 Steel Fabrication.Calculation of Heater-tube Thickness in Petroleum Refineriesĭesign procedures and criteria used for calculating the required wall thickness of new tubes and associated component fittings for petroleum refinery heaters.
![api 560 standard api 560 standard](https://vintageking.com/wp/wp-content/uploads/AskAPIAnything1-1.jpg)
INSTRUMENT AND AUXILIARY CONNECTIONS.49 11.1 Flue Gas and Air.50 11.4 Tube-Skin Thermocouples. 48 10.7 Electrical Equipment and Hazard Classification.49 *11.
![api 560 standard api 560 standard](http://fr.tcvalves.net/Content/ue/net/upload/2017-03-23/5abd218e-2f5f-44a2-92d5-f7ea29108e85.jpg)
45 10.5 Air to Flue Gas Preheaters (Direct Preheaters).46 10.6 Combustion Air Ducting (Addition to API Section 10). 42 10.3 Fans and Drivers.44 10.4 Damper Controls.
![api 560 standard api 560 standard](https://image.slidesharecdn.com/aichesmartstackdamperapril2018rev2-180427192048/95/aiche-smart-stack-damper-design-provides-better-control-of-fired-heaters-20-638.jpg)
40 MINIMUM CLEARANCE FOR NATURAL DRAUGHT BURNER OPERATION. 38 9.5 Wind-Induced Vibration Design.38 9.6 Materials. 35 9.3 Allowable Stresses.38 9.4 Static Design. 32 8.6 Furnace Sealing (Addition to API Section 8).33 9. 22 7.7 Thermal and Acoustic Insulation.24 8. 22 7.3 Castable Construction.22 7.4 Block Insulation. 12 3.2 Extended Surface.15 3.3 Materials. 10 2.5 Design Codes (Addition to API Section 2).11 3. 7 2.3 Mechanical8 2.4 Noise Control (Addition to API Section 2). 3 1.11 Co-ordination of Design (Addition to API Section 1).3 * 1.12 Quality Assurance (Addition to API Section 1). 1 1.10 Application of this Specification (Addition to API Section 1). 1 * 1.2 Alternative Designs.1 1.6 Referenced Publications.1 1.7 Proposals. Date Page(s) Description _ĬUSTODIAN (See Quarterly Status List for Contact)īP Oil, Separations and Energy Issued by:-Įngineering Practices Group, BP International Limited, Research & Engineering Centre Chertsey Road, Sunbury-on-Thames, Middlesex, TW16 7LN, UNITED KINGDOM Tel: +44 1Fax: +44 1Telex: 296041įOREWORD. Its purpose is to lay down the minimum requirements for design, materials, fabrication, testing, preparation for shipment and erection of fired heaters.ĪMENDMENTS Amd. This specification provides amplification of existing clauses within API 560, First Edition January 1986 and additional requirements to that standard. SCOPE AND PURPOSE This Specification covers the general requirements of BP for fired heaters and their associated steel stacks conforming to API Std 560, Fired Heaters for General Refinery Services. No.įIRED HEATERS TO API 560 (Replaces BP Engineering Std 162) None of the information contained in this document shall be disclosed outside the recipient's own organisation without the prior written permission of Manager, Standards, BP International Limited, unless the terms of such agreement or contract expressly allow.īP GROUP RECOMMENDED PRACTICES AND SPECIFICATIONS FOR ENGINEERING Issue Date Doc. The information contained in this document is subject to the terms and conditions of the agreement or contract under which the document was supplied to the recipient's organisation. GS 122-1 FIRED HEATERS TO API 560 December 1996Ĭopyright © The British Petroleum Company p.l.c.Ĭopyright © The British Petroleum Company p.l.c.